DfMA coordination
Design for Manufacture & Assembly is led from RIBA Stage 2 — interfaces, tolerances and module geometries locked before manufacturing release.
Next Generation construction is only as strong as the discipline behind it. We engineer compliance into the system from RIBA Stage 2, document the evidence at every hold point, and hand over a complete record at Stage 6.
Fire, acoustic, airtightness and thermal continuity are not handed to the contractor on site — they are engineered into the manufactured element.
Design for Manufacture & Assembly is led from RIBA Stage 2 — interfaces, tolerances and module geometries locked before manufacturing release.
Module-to-module, module-to-structure and module-to-services interfaces engineered with documented tolerances on every joint.
Fire strategy engineered into the panel and module build-ups — specialist fire engineer engaged from concept stage.
Inter-tenancy and wet-room acoustic separation designed and tested against project-specific targets.
Factory-applied membranes, taped joints and documented connection sequences deliver consistent test results.
Continuous insulation strategies — designed to eliminate cold bridging through interfaces and connections.
Every layer documented against the evidence pack. Every record traceable to the unit it covers.
Mill certificates, supplier QA records and conformity certificates captured against each batch.
Dimensional, weld and finish inspection at defined hold points within the production line.
Module / panel functionally tested and signed off before release to logistics.
Independent site inspection on receipt — tolerances and damage logged against each unit.
Fire stopping, acoustic, airtightness and M&E commissioning evidenced before handover.
Each hold point produces a documented decision. No stage progresses until the previous stage's evidence is complete.
DfMA strategy locked. System selection (LSF / volumetric / hybrid). Fire and acoustic specialists engaged. Module size envelope defined against transport and craneage.
Interface geometry frozen. Service routing through manufactured elements coordinated. Carbon and energy strategy committed. Fixed-price proposal issued.
Manufacturing-issue drawings released. Evidence pack structure agreed. QA inspection plan issued.
Production line inspection cycle live. Site interface coordination weekly. Hold-point reviews documented.
Evidence pack issued. As-built BIM model handed over. O&M, warranty and aftercare schedule transferred.
From environmental management to healthcare and educational standards, our systems are built to meet — and exceed — the certifications that matter to UK and international developers.
Environmental management
Sustainability rating
Residential warranty
UK statutory requirements
Clinical environments
DfE & EFA frameworks
Ultra-low energy performance
Circular economy ready
Talk to us about deploying our capability and delivery disciplines to your scheme.