Skip to content
Sector

Healthcare

Hospitals, imaging centres, transplant facilities and clinical extensions are some of the most demanding environments in construction. Live operations, patient safety, infection control and 24/7 service continuity remove the option of a disruptive build.

Why offsite for this sector

Where the model earns its place.

  • Up to 90% of work removed from the live hospital site
  • Programme compression around clinical service windows
  • Factory QA appropriate to clinical environment standards
  • Reduced infection-control risk versus traditional build
  • Predictable handover dates for clinical commissioning
What we coordinate

Sector-specific delivery considerations.

Clinical engagement

Estates, infection control and clinical leads engaged from concept stage to lock down operational requirements.

Live-environment logistics

Module delivery, craneage and assembly sequenced around clinical service continuity.

Specialist M&E

Medical gases, isolation rooms, imaging suites and specialist drainage coordinated within the manufactured envelope.

Regulatory compliance

HTM/HBN, fire, acoustic and infection-control standards engineered in from RIBA Stage 2.

Reference projects

Selected healthcare references.

Each project is tagged by contribution to the project (I.e. full delivery, under a Main Contractor etc.).

BEO Hospital exterior with white facade in Chengdu
Healthcare

Chengdu, Sichuan, China

BEO Hospital

Designed to handle 2,000 daily inpatients, 6,000 daily outpatients and 600 emergency visits a day, with a shared diagnostic and treatment resource centre at the centre of the campus. Several prefabricated architectural and structural components reduce embodied carbon and eliminate waste. High-efficiency LED lighting and plumbing fixtures reduce energy use, and interior finishes contain a high proportion of recycled content.

JV PartnerHealthcare
Netcare Milpark Hospital building, Johannesburg
Healthcare

Johannesburg, South Africa

Netcare Hospital Milpark

Netcare Milpark Expansion Project — two new medical buildings totalling a 20,000 sqm state-of-the-art medical centre. The project included an oncology bunker, catheterisation laboratories, four operating rooms and 135 beds. The total project timeline for design and construction was 12 months.

JV PartnerHealthcare
Hainan Hospital exterior, Haikou City
Healthcare

Haikou City, China

Hainan Hospital

Situated in Jiangdong New District, Haikou City — 199,000 sqm gross floor area with 1,000 inpatient beds. A Class-A tertiary hospital integrating medical treatment, teaching, research, healthcare and rehabilitation. Garden-style architectural layout inspired by traditional 'Pai-dian shops' and 'multi-entry courtyards', with a three-dimensional greening system of sunken courtyards, roof gardens and sky greening platforms.

JV PartnerHealthcare
Shandong Cancer Hospital building exterior, Jinan
Healthcare

Jinan City, China

Shadong Cancer Hospital

Site of nearly 35 hectares with a building area of 339,700 sqm, 1,950 beds and an annual outpatient capacity of 600,000. Operates 20 specialties and 45 inpatient wards. The Proton Centre, part of the Jinan International Medical Science Center, opened for clinical use in November 2023 with proton radiation systems and Tomotherapy.

JV PartnerHealthcare
Liver Transplant Centre at Kings College Hospital, Denmark Hill, London
Healthcare

Denmark Hill, London

Liver Transplant Centre, Kings College Hospital

Constructed as part of the 'Infill Block' project, modular building IB3 was inserted into a gap between two existing buildings. Houses two liver transplant theatres with shared anaesthetic area and ancillary theatre accommodation, plus a three-bed post-operative high-dependency recovery area. Three further storeys above provide 47 beds in single and multiple wards. Over 100 modular units used and the building was completed in a two-month programme.

ArchitecturalHealthcare
Imaging Centre at Kings College Hospital, Denmark Hill, London
Healthcare

Denmark Hill, London

Imaging Centre, Kings College Hospital

Constructed as part of the 'Infill Block' project, modular building IB4 was inserted into a gap between two existing buildings. A four-storey Imaging Centre housing two MRI scanners and a Cath lab. Built using modular steel-framed modules clad with a mechanically fixed brick-slip system, completed with minimal disruption to daily operations. Designed to BREEAM 'Excellent' rating to support NHS net-zero carbon goals.

ArchitecturalHealthcare
Woodlands Care Center, Singapore — hospital building delivered using PPVC modular construction
Healthcare

Singapore

Woodlands Care Center

Hospital scheme comprising 488 standard modules and 83 roof modules, using a CandleLock twist-lock connection system. The project earned wide recognition within the Singapore construction community and enabled our Singaporean partner to jointly obtain PPVC (Prefabricated and Prefinished Volumetric Construction) certification, issued by the Singapore Structural Steel Construction Association. Total built area of 25,000 sqm, delivered through design and construction in 12 months.

JV PartnerHealthcare
North Lantau Hospital Infection Control Centre — MiC isolation ward block on Hong Kong's Lantau Island
Healthcare

Hong Kong, China

North Lantau Hospital — Infection Control Centre (HKICC)

9,500 sqm Infection Control Centre delivering 800 isolation beds in a 16-week programme. Innovative MiC and MiMEP methodologies, supported by full-scale BIM, significantly raised site coordination quality, simplified and accelerated installation and improved construction accuracy. Standardised isolation wards were built from three prefabricated MiC units per cubicle, transported to site for installation.

JV PartnerHealthcare
Shenzhen Children's Hospital, Longhua Campus — paediatric hospital with modular podium and 10-storey towers
Healthcare

Shenzhen, China

Shenzhen Children's Hospital — Longhua Campus

31,500 sqm paediatric hospital delivered in 78 weeks. Located in the Minzhi area of Longgang District, the hospital provides treatment for 1,500 children of different ages across the city and province. A single-storey five-unit layout with staggered movement front and back gives a podium of modular diagnostic units, with upper and lower light courtyards and 10-storey towers above.

JV PartnerHealthcare
Woodlands Road Polyclinic and Senior Care Centre — 9-storey PPVC modular care home, Singapore
Healthcare

Singapore

Woodlands Road Polyclinic and Senior Care Centre

9,500 sqm 9-storey open-plan polyclinic and nursing home with 243 beds, situated in the northern part of Pulau Ujong Island. Entirely built from factory-made Pre-finished Volumetric Construction (PPVC). Each ward comprises 3 or 4 modules weighing between 10 and 15 tonnes — 350 factory-made modules transported to and installed on site, with a 40-week delivery programme.

JV PartnerHealthcare
Raffles Hospital Pudong — comprehensive A-class hospital building at dusk in Shanghai
Healthcare

Shanghai, China

Raffles Hospital, Pudong

Comprehensive A-class hospital designed to international healthcare standards. 400-bed capacity across 12 above-ground floors and 3 underground levels, constructed to JCI (Joint Commission International) certification standards. Over 70,000 sqm of floor area covering internal medicine, surgery, paediatrics and emergency medicine across multiple ward types.

JV PartnerHealthcare
Community Hospital, Dakar — under design development
Healthcare

Dakar, Senegal

Community Hospital, Dakar

Under design development. Proposals for an 8,500 sqm next-generation community hospital with on-site medical-personnel residential facilities, forming part of an urban-expansion masterplan projected for 100,000 new residents.

JV PartnerHealthcare
Next Steps

Bring our precision-engineered solutions to your next façade project

Talk to us about deploying our capability and delivery disciplines to your scheme.