Infill Panels & Pods
Non-loadbearing infill panels and fully-fitted pods — bathrooms, plant rooms, toilet facilities and kitchenettes — manufactured offsite and dropped into a primary structure. The fastest way to remove the most defect-prone, trade-heavy work from the site programme.
System definition.
- Non-loadbearing infill panels for facades and partitions
- Bathroom pods fully fitted: tiles, sanitaryware, taps, drainage
- Plant room pods pre-commissioned
- Toilet facility and utility pods to standardised specifications
Where it performs.
- Repeat-cell schemes within concrete or steel primary structures
- Hotel & Leisure, student accommodation and BTR within hybrid builds
- Healthcare wet rooms and treatment areas
- Schemes seeking high offsite content without full volumetric
Where the value lands.
Trade compression
Removes 8–12 site trades from the most coordination-heavy spaces.
Quality lift
Wet-room pods are tested and watertight before they leave the factory.
Speed
Pods land complete; only mechanical and electrical final connections remain.
Defect reduction
Materially reduces the snagging cost and warranty exposure of high-spec spaces.
What we coordinate from day one.
Connection details
Documented connection sequences for power, water, drainage and ventilation.
Tolerance management
Primary-structure setting-out coordinated with pod tolerances at design stage.
Acoustic separation
Engineered to required ratings between pod and surrounding rooms.
Maintenance access
Service zones designed for in-life access without demountable strip-out.
Bring our precision-engineered solutions to your next façade project
Talk to us about deploying our capability and delivery disciplines to your scheme.
